AmpUp Load Management Spec Sheet - August 2025

AmpUp Load Management Specification Sheet

What is Cloud-based EV Charging Load Management?

Cloud-based EV charging load management is when a central system gains the ability to influence the charging power or current of a specific EV, or the total allowed energy consumption on an entire charger or group of chargers. Influencing the charge power or current is based on energy transfer limits at specific points in time and based on a grid connection, energy availability on the grid, or the wiring of a building.

Load management limits are combined in a Charging Profile and can be set by a user in AmpUp’s SaaS login. A Charging Profile is a specific message sent from AmpUp’s central system to the charger that includes a load limit to control max output of the charger.

Station owners can also set load schedules to lower power during utility on peak periods or to keep their Location on a tariff rate below a kW threshold. Once a schedule is set, the slider will disappear. When the station owner returns to the Location page, they may add another load schedule, which is especially useful when a utility has more than one demand on-peak period. Only one schedule can be active for any day of the week and time of day.

When under a set limit, the system will use dynamic load balancing within an AmpUp Pro Location’s chargers. Turning this on will set chargers to recognize when a vehicle is not requesting the available power set by AmpUp and will redistribute the remaining power to other chargers at the Location. The baseline setting for the AmpUp central system is to check this every 5 minutes.

What benefits does cloud-based load management provide?

EV charging load management through AmpUp unlocks the ability to:

How do I design my EV charging site for load management?

General Reference Diagram

Frequently Asked Questions (FAQs)

Does the EVSE need to be connected to a dedicated sub panel for load management to work?

The EVSE doesn't have to be connected to a dedicated sub panel for the load management to work but it is an option. Since the load management is by location on the Community Manager tool you could have it set up to either be for a dedicated panel, or even for two (or more) units. This depends on local codes and inspectors as well, but it is a good rule of thumb.

For example: If it was a situation where you had a dedicated EVSE panel you would add all of those chargers to one location and then set the max load cap for 80% of the panels capacity. This would ensure that the main breaker would not trip and you could still size and wire each unit to its full load amps.

Another situation would be if two units are getting added to an existing panel that only has a set level of available amps, but you want to add more than the existing panel can handle. This situation if you had 60A available then you can wire up the units for full load but then share that 60A to the units that were installed.

Does the AmpUp software automatically “read” the max power of the chargers, or is that something you enter during setup?

Yes, during integration the units approved will have the max amps recorded and tied to the unit. So if the customer wants load management just to lower max Amps at will, and they enter unknown kW during registration, we will automatically populate the max available power for the station.

In cases where you may have multiple dedicated sub-panels for “groups” of chargers, how does the AmpUp load management software handle that? Do you set up “groups” within the software?

This is not something AmpUp has implemented yet but is in our roadmap. For now it is just per location.

What happens to a car if the charging station loses connection to AmpUp while my car is plugged in with load limits?

If the station loses connectivity to AmpUp during a charging session it will continue the charging session. If it is a pay to use station the station and the session ended during the connection loss, the unit will send the transaction details after the unit has regained connectivity to finalize billing. If the station regains connectivity during the session, the session will still resume as long as the; EV wasn't full, or a time session limit was hit, etc.

AmpUp can now enable offline mode where locally stored RFID UIDs can authorize charging sessions even when the charger has lost connection to the AmpUp central system. This is only available on the Multi plan but will be expanded to the Pro plan in Q3 2025.

What happens if there is a power outage while my car is plugged in on a load limit? Does the station keep charging once power is restored?

If the station loses power during a charging session it will stop dispensing energy to the EV, but once the station has regained power it will then send the transaction details after the unit has regained connectivity to finalize billing. The station will not resume charging the original session after the power was restored, as we would have no way to know if the original driver was still plugged in.